Cut-Away section of our Manufactured Homes
Mock-up Displaying
- 1. 2x6 wall 16” o.c. (Strength, increased insulation)
- 2. Linoleum running under partition walls. (Continuous no splice, curling)
- 3. Caulking at electrical penetrations. (Energy Star)
- 4. Floor penetration sealed with foam. (Energy Star)
- 5. Sealant applied to sub floor in wet areas.
- 6. Upgrade floor insulation. (Energy Star)
- 7. Sub-floor glued with 2 part glue. (Prevent squeaks, Continuous floor, and strength)
- 8. Heat duct connections sealed with ‘mastic.’ (Energy Star) (Prevents air from flowing where not supposed to)
- 9. Blackboard sheathing standard with vinyl covered drywall.
- 10. Pex water lines. (Color coded for hot and cold)
- 11. Standoff brackets for wiring. (Prevent accidental nail in wire)
- 12. Finished drywall showing glued screwed, and O.S. B. wrap. (Paperback insulation with finished drywall for vapor barrier, glued for strength, screwed prevent nail heads from showing, O.S.B. strength)
- 13. Foam Tape exterior wall to floor. (Energy Star) (Prevent air infiltration)
- 14. Duct Board seal at heat duct crossovers. (Energy Star) (Prevent air filtration)
- 16. Belly paper and under joist bracing under duct crossover at rim joist. (Belly paper rodent control, Bracing for strength)
- 17. Center seal at marriage line. (Energy Star) (Prevent air filtration)
- 18. Vinyl covered drywall glued, fastened at perimeter, none in field. (Vinyl panel is vapor barrier)
Double T Homes ©2010-2011
Double T Homes, inc. Media and external link are provided for entertainment and informational purposes only.